Your Odisha facility needs power that doesn't fail. Grid costs ₹9-12/kWh. Diesel backup costs ₹18-22/kWh.
48 MW solar in Khurda — BESS-ready. Full plant — OPTCL approved. Offtake open Q2 2027. Open Access.
What Khurda Energy Park is
Not rooftop panels. Ground-mounted solar farm. 48 MW total capacity. Located in Khurda district, 15 km from Bhubaneswar.
Default offtake is daytime solar via Open Access. The site is designed BESS-ready — we can add plant-side battery storage to your contract if you need evening delivery, curtailment mitigation, or firmer supply. We do not bundle BESS unless you ask for it.
Offtake open across the 48 MW plant. Power delivery Q2 2027. Minimum 5 MW per customer.
Why Khurda matters for Odisha industries
Location:
- Khurda district — industrial corridor, data center growth, manufacturing parks
- 15 km from Bhubaneswar
- Grid interconnection approved
- 400 kV evacuation ready
Solar Resource:
- 1,800+ kWh/kWp annual yield (PVGIS modeled)
- 5+ kWh/m²/day irradiance
- Best in Eastern India
- Year-round consistency
Industrial Demand:
- Steel, sponge iron, aluminum (Angul, Jharsuguda)
- Chemical facilities (Paradip)
- Data centers (Khurda)
- Manufacturing (all districts)
Your facility draws from GRIDCO's grid. We inject at our end. You pay us for solar units. GRIDCO handles wheeling. Regulatory approvals done. You get power.
BESS-ready — optional plant-side storage
48 MW Solar Park — BESS-ready for high-reliability power.
Battery storage can be added for customers requiring evening peak support, firm supply, or enhanced reliability.
Khurda is BESS-ready, not BESS-bundled.
Base Open Access offtake:
- Daytime solar generation
- Competitive indicative tariff
- GRIDCO wheeling (quoted all-in)
If you request plant-side BESS:
- Stores excess daytime solar
- Dispatches in evening hours
- Can reduce curtailment and improve delivery profile
- Scoped into your PPA — tariff and terms quoted separately
Reliability tier (separate add-on):
- On-site BESS at your facility
- 99.95% uptime SLA
- For furnaces, data centers, cold chain
Illustrative economics
5 MW Industrial Offtake — Khurda Area (solar-only, illustrative):
Current Grid:
- Consumption: ~20,000 MWh/year (daytime-heavy load)
- Rate: ₹10/kWh average
- Annual cost: ~₹2 crore
- Demand charges: material add-on
- Total: well above solar-only savings baseline
With Khurda Energy Park (Open Access, solar-only):
- Indicative solar tariff: ₹5.0–₹5.5/kWh for daytime open-access supply. Final landed cost depends on load profile, open-access charges, losses, and applicable regulatory charges.
- Daytime coverage: 60-70% of load (typical)
- Wheeling via GRIDCO (included in quoted tariff)
- Potential savings: scale with offtake — request a custom model
Illustrative. BESS adds cost and changes delivery profile. Actual economics depend on load profile, contract terms, and regulatory charges. Request a custom proposal.
What you get
Open Access Structure:
- We inject into GRIDCO grid
- You draw at your facility
- GRIDCO handles wheeling
- Single bill: solar units + wheeling (we quote all-in)
Contract Terms:
- 5+ MW minimum offtake
- 15-year preferred PPA, extendable up to 25 years
- 10–25 year price protection; ₹5.0–₹5.5/kWh indicative daytime solar; plant-side or on-site BESS optional
- Fixed or indexed pricing (contract-specific)
- OREP-2022 compliant
- Plant-side BESS optional — scoped if requested
Who it's for
10+ MW industries in Khurda, Bhubaneswar, Cuttack, Angul, Paradip.
Facilities with:
- High daytime consumption
- Grid costs ₹8-12/kWh
- Demand charges adding 30-50%
- Evening load or firm delivery needs (ask about plant-side BESS)
- Zero tolerance for outages (add Reliability tier)
Industries:
- Steel and sponge iron
- Aluminum and metals
- Chemical and refining
- Data centers
- Food processing and cold chain
- Manufacturing
The Odisha solar reality
Grid power costs will keep rising. 8% annual escalation. Demand charges. Power factor penalties. You have zero control.
Khurda Energy Park offers 10–25 year price protection — ₹5.0–₹5.5/kWh indicative daytime solar tariff. 15-year preferred PPA, extendable up to 25 years. Plant-side BESS (at the park) for evening dispatch and firmer delivery; on-site BESS (Reliability tier at your facility) for backup — each optional, scoped in your contract.
Full 48 MW plant. OPTCL feasibility complete; approvals received. Q2 2027 delivery.
Request pricing—we'll share indicative tariff, offtake terms, and whether BESS belongs in your contract.