ZIANI
  • KHURDA ENERGY PARK
  • ABOUT
  • INVESTORS
  • ZIANI OS
  • BLOG
  • CONTACT
ZIANI

Industrial-grade solar infrastructure for mission-critical operations.

© Copyright 2026 ZIANI. All Rights Reserved.

Solutions

  • Solar Odisha — Khurda Energy Park
  • Direct PPA
  • Captive Power
  • Reliability Add-On

Company

  • ZIANI Capital
  • ZIANI OS
  • Contact
  • Blog

Legal

  • Terms of Service
  • Privacy Policy
  • Cookie Policy
Enterprise solar infrastructure • SOC 2 Aligned • 99.95% Uptime SLA
LinkedIn

Khurda Energy Park — 48 MW Solar + BESS in Odisha. 5 MW Available.

Feb 26, 2026
solar odisha
khurda
khurda energy park
open access odisha
BESS
industrial solar

Solar Odisha: 48 MW solar + BESS in Khurda. Open Access. Power delivery Q3 2026. ₹5-5.5/kWh indicative. 1+ MW minimum offtake. Request pricing.

  1. Home
  2. /Blog
  3. /Khurda Energy Park — 48 MW Solar + BESS in Odisha. 5 MW Available.

Your Odisha facility needs power that doesn't fail. Grid costs ₹9-12/kWh. Diesel backup costs ₹18-22/kWh.

48 MW solar + BESS in Khurda. 5 MW available Q3 2026. Open Access. Always-on power.

What Khurda Energy Park is

Not rooftop panels. Ground-mounted solar farm with plant-side battery storage. 48 MW total capacity. Located in Khurda district, 15 km from Bhubaneswar.

Solar charges the batteries by day. Stored energy delivers in evening hours. Not just daytime solar — extended delivery, grid curtailment avoided, GRIDCO injection requirements met.

5 MW offtake available. Power delivery Q3 2026. Minimum 1 MW per customer.

Why Khurda matters for Odisha industries

Location:

  • Khurda district — industrial corridor, data center growth, manufacturing parks
  • 15 km from Bhubaneswar
  • Grid interconnection approved
  • 400 kV evacuation ready

Solar Resource:

  • 1,800+ kWh/kWp annual yield (PVGIS modeled)
  • 5+ kWh/m²/day irradiance
  • Best in Eastern India
  • Year-round consistency

Industrial Demand:

  • Steel, sponge iron, aluminum (Angul, Jharsuguda)
  • Chemical facilities (Paradip)
  • Data centers (Khurda)
  • Manufacturing (all districts)

Your facility draws from GRIDCO's grid. We inject at our end. You pay us for solar units. GRIDCO handles wheeling. Regulatory approvals done. You get power.

Solar + BESS — not optional

Plant-side BESS is standard. Every ZIANI system includes it.

What it does:

  • Stores excess daytime solar
  • Dispatches in evening hours — you get solar beyond sunset
  • Avoids grid curtailment — no wasted generation
  • Meets GRIDCO injection requirements — ramp rate, frequency, compliance
  • Lowers your effective tariff — better plant utilization

Without BESS: Daytime solar only. Evening = grid. Curtailment losses. Higher effective cost.

With BESS: Extended solar delivery. Fewer grid-dependent hours. Lower blended rate.

Illustrative economics

2 MW Industrial Offtake — Khurda Area:

Current Grid:

  • Consumption: ~8,000 MWh/year (daytime-heavy load)
  • Rate: ₹10/kWh average
  • Annual cost: ₹80 lakh
  • Demand charges: +₹20 lakh
  • Total: ₹1 crore/year

With Khurda Energy Park (Open Access):

  • Solar tariff (indicative): ₹5.0-5.5/kWh
  • Daytime coverage: 60-70% of load
  • Wheeling via GRIDCO (included in quoted tariff)
  • Potential savings: ₹50-80 lakh annually

Illustrative. Actual economics depend on load profile, contract terms, regulatory charges. Request a custom proposal.

What you get

Open Access Structure:

  • We inject into GRIDCO grid
  • You draw at your facility
  • GRIDCO handles wheeling
  • Single bill: solar units + wheeling (we quote all-in)

Contract Terms:

  • 1+ MW minimum offtake
  • 10-25 year PPA term
  • Fixed or indexed pricing (contract-specific)
  • OREP-2022 compliant

Reliability Option:

  • Add Reliability tier for on-site BESS at your facility
  • 99.95% uptime SLA
  • Instant switchover when grid fails
  • For furnaces, data centers, cold chain — operations that can't stop

Who it's for

10+ MW industries in Khurda, Bhubaneswar, Cuttack, Angul, Paradip.

Facilities with:

  • High daytime consumption
  • Grid costs ₹8-12/kWh
  • Demand charges adding 30-50%
  • Zero tolerance for outages (add Reliability tier)

Industries:

  • Steel and sponge iron
  • Aluminum and metals
  • Chemical and refining
  • Data centers
  • Food processing and cold chain
  • Manufacturing

The Odisha solar reality

Grid power costs will keep rising. 8% annual escalation. Demand charges. Power factor penalties. You have zero control.

Khurda Energy Park locks your rate. Fixed pricing. 10-25 years. Solar + BESS. Always-on delivery.

5 MW available. Q3 2026. First-come, first-served.

Request pricing—we'll share indicative tariff, offtake terms, and delivery timeline for your facility.

Get pricing →

Related Topics

Latest Solar Industry Insights

Stay updated with the latest developments in solar energy

Get Site-Specific Analysis

Request detailed feasibility study for your location

Related Articles

Captive Solar in Odisha — Own Your Plant, Slash Costs, Lock Incentives

Captive solar Odisha: 26% ownership. No CSS. 25% wheeling exemption. Stamp duty exemption. ₹100 crore plant, 5-year payback with Odisha incentives.

February 26, 2026Read more →

GRIDCO Wheeling for Solar — How Open Access Works in Odisha

GRIDCO wheeling Odisha: How solar injection works. Transmission charges, wheeling charges, losses. Approval process. Why BESS matters for compliance.

February 26, 2026Read more →