Khurda Energy Park

Khurda, Odisha — 48 MW solar project under development

48 MW Solar Park — solar-first open access — BESS optional
BESS-Ready Site
Target Q2 2027 · Grid-Aligned
OPTCL Approved
Open Access

10–25 year price protection, with ₹5.0–₹5.5/kWh indicative daytime solar tariff. Open-access offtake now being accepted — 5+ MW minimum. Battery storage is optional — at the solar park, at your facility, or both.

Battery Storage (Optional)

Batteries can sit in two places — we scope what you need in the contract. Default offtake is daytime solar; storage is never bundled unless you ask.

  • Default: daytime solar via Open Access — solar-first project plan
  • Plant-side BESS (at Khurda): optional — stores solar for evening dispatch, curtailment mitigation, firmer open-access delivery
  • On-site BESS (at your facility): Reliability tier — instant backup if grid or line fails; 99.95% uptime SLA where contracted
  • BESS-ready site: layout and interconnection support plant-side storage if you add it later

Illustrative Economics — Industrial Customer

Indicative solar tariff: ₹5.0–₹5.5/kWh for daytime open-access supply. Final landed cost depends on load profile, open-access charges, losses, and applicable regulatory charges.

Daytime Solar Coverage (typical)
60–70%
of daytime load
Potential Annual Benefit (illustrative)
₹1.25–2 Cr
for 5 MW offtake — solar-only baseline

Plant-side and on-site BESS are optional and priced separately. Request a custom proposal for landed cost at your facility.

BESS-Ready — Add On Request
Competitive Tariff
10–25 Yr Price Protection
100% Renewable
OREP-2022 Compliant

Managed end-to-end on ZIANI OS — 24/7 monitoring, predictive maintenance, performance optimization.

Learn about ZIANI OS →
5+ MW
Minimum Offtake
Q2 2027
Target Delivery
15 Yrs
Preferred PPA · Extend to 25

Get Indicative Pricing

Share your power requirements. Receive a proposal within 48 hours.

Request Pricing

We'll ask about your consumption, location, and current tariff to prepare a custom proposal.

How Power Reaches You

☀️
We Generate
Solar at Khurda plant
BESS (Optional)
If included in your PPA
Inject to Grid
GRIDCO network
🔌
You Draw
From your existing connection
💰
Pay Per Unit
Only for solar consumed
No new infrastructure — uses existing GRIDCO grid
Your connection stays — GRIDCO remains your backup
We handle approvals — Open Access paperwork is on us

Common Questions

How to Offtake

1

Share Load Profile

Monthly consumption, demand, current tariff

2

Get Proposal

Indicative tariff, savings estimate, terms

3

Sign PPA

We handle Open Access approvals

4

Consume Power

Power flows Q2 2027. Pay per kWh.

Registered Company
ZIANI Energy Private Limited
CIN: U35105OD2025PTC051734
Registered Office
Bhubaneswar, Odisha
Saheed Nagar, 751007
Project Status
Under Development
OPTCL complete · finance structuring · EPC via partners

Ready to Cut Power Costs?

Open-access offtake now being accepted. Request an indicative proposal.