99.95% uptime SLA. 8,734 hours of power per year.
We'll ask for your load details to generate a site-specific price.
Your industry will run on ZIANI. Carbon negative from day one.
We select the optimal mix (solar, wind, battery storage, hydrogen, biomass & waste-to-energy) based on your location and load profile.
soaring tariffs
downtime and outages
new grid connections
Uptime SLA
8,734 hours of power per year
costs less than your current tariff
Delivery
fast, reliable execution
You don't buy equipment. You buy uptime.
99.95% uptime SLA. Carbon negative. First plant launching.
We evaluate your site and choose the optimal mix: solar, wind, battery storage (standard), hydrogen backup when needed, and biomass & waste-to-energy where applicable.
48 MW Solar Park — solar-first open access. Plant-side or on-site BESS optional. Offtake now being accepted.
Under Development
Feasibility & Approvals
Target Delivery (Grid-Aligned)
10–25 year price protection, with ₹5.0–₹5.5/kWh indicative daytime solar tariff. 15-year preferred PPA, extendable up to 25 years. Plant-side BESS (at the solar park) or on-site BESS (at your facility) — optional, scoped per contract.
View Project & Request PricingThe AI operating system that runs your power infrastructure. Monitors. Optimizes. Never sleeps.
Real-time telemetry from every inverter, panel, and battery. Instant anomaly detection.
AI predicts equipment issues before they become failures. Minimize downtime.
Automated IEEE 1547 & IEC 61850 monitoring. Real-time violation alerts.
Track generation, efficiency, and revenue. Automated reporting for stakeholders.
End-to-end delivery. You focus on your business.
We secure land, handle all regulatory approvals, environmental clearances, and grid connectivity.
EPC delivered through qualified partners. Solar, wind, BESS-ready sites, biomass & waste-to-energy — scoped to your load profile and delivery timeline.
24/7 AI-managed operations when under contract. Predictive maintenance and long-term O&M scoped to your agreement.
Grid compliance, regulatory reporting, carbon credit monetization — all handled.
You sign. We deliver power.
No land hunting. No contractor management. No regulatory headaches. Just reliable power.
Three ways to secure dedicated power
Zero capex. Instant savings.
Khurda Energy Park offtake is under development. Add plant-side BESS or our Reliability tier if your load profile requires it.
Your plant. Maximum savings.
EPC through qualified partners. You own the infrastructure when structured as captive. Scope BESS in your design if needed.
On-site BESS. Zero downtime.
For furnaces, data centers, cold chain. On-site BESS handles grid failures. Add hydrogen for multi-hour backup (99.99%).
Data Centers
Steel & Cement
Food & Cold-Chain
Hospitals
Industrial Parks
Equipment-verified. Real-time tracked. First plant projections.
Tonnes CO2e
Projected per plant annually
Carbon Revenue
Projected per plant annually
ESG Rating
Institutional compliance
Verification
Equipment-backed proof
Not just renewable certificates.
Equipment-verified carbon credits with real-time tracking. First plant ready.
Pre-certified for grid interconnection. Ready for enterprise procurement.
IEEE 1547 & IEC 61850 Compatible
Designed for utility interconnection standards. Automated frequency regulation, voltage control, and power quality monitoring.
SOC 2 & ISO 27001 Aligned
Controls designed for SOC 2 readiness and hyperscaler vendor requirements. Continuous monitoring and audit trails.
Real-time Tracking
Automated violation detection and alerting. Continuous compliance monitoring with instant notifications.
Automated Reporting
Complete audit trails for insurance, regulatory reporting, and carbon credit verification. Export-ready documentation.
Built for compliance from day one. Our systems are designed for grid interconnection and enterprise security standards.
Why ZIANI wins
We build infrastructure, not pitch decks. First plant launching.
Project finance under structuring. Capital aligned to project milestones.
ZIANI OS monitors every asset, 24/7. Catches issues before they become failures.
Learn about ZIANI OS →Real insights from building reliable industrial power infrastructure
Reduce power costs with solar open-access offtake. Indicative daytime solar ₹5.0–₹5.5/kWh. 10–25 year price protection. Keep grid backup.
Your lender asked for an ESG roadmap. Your export customers need carbon disclosure. Your board wants sustainability metrics. Solar delivers all three in 6 months.
Applied for 50 MW grid connection. Utility said 3-5 years. Meanwhile your datacenter sits empty. We deliver dedicated power in 12 months.