ZIANI
  • KHURDA ENERGY PARK
  • ABOUT
  • INVESTORS
  • ZIANI OS
  • BLOG
  • CONTACT
ZIANI

Industrial-grade solar infrastructure for mission-critical operations.

© Copyright 2026 ZIANI. All Rights Reserved.

Solutions

  • Solar Odisha — Khurda Energy Park
  • Direct PPA
  • Captive Power
  • Reliability Add-On

Company

  • ZIANI Capital
  • ZIANI OS
  • Contact
  • Blog

Legal

  • Terms of Service
  • Privacy Policy
  • Cookie Policy
Enterprise solar infrastructure • SOC 2 Aligned • 99.95% Uptime SLA
LinkedIn
NewKhurda Energy Park — 48 MW under development · OPTCL approved · Offtake open

Always-On Power.
For Industry.

99.95% uptime SLA. 8,734 hours of power per year.

Request Proposal

We'll ask for your load details to generate a site-specific price.

Your industry will run on ZIANI. Carbon negative from day one.

We select the optimal mix (solar, wind, battery storage, hydrogen, biomass & waste-to-energy) based on your location and load profile.

Reliability without compromise.

₹8–12/kWh

soaring tariffs

10–15%

downtime and outages

3–5 years

new grid connections

We deliver reliable power for industry.

99.95% SLA

Uptime SLA

8,734 hours of power per year

Lower Cost

costs less than your current tariff

12-Month

Delivery

fast, reliable execution

You don't buy equipment. You buy uptime.
99.95% uptime SLA. Carbon negative. First plant launching.

We evaluate your site and choose the optimal mix: solar, wind, battery storage (standard), hydrogen backup when needed, and biomass & waste-to-energy where applicable.

OPTCL feasibility complete · approvals receivedNow accepting offtake

Khurda Energy Park

48 MW Solar Park — solar-first open access. Plant-side or on-site BESS optional. Offtake now being accepted.

48 MW

Under Development

OPTCL

Feasibility & Approvals

Q2 2027

Target Delivery (Grid-Aligned)

10–25 year price protection, with ₹5.0–₹5.5/kWh indicative daytime solar tariff. 15-year preferred PPA, extendable up to 25 years. Plant-side BESS (at the solar park) or on-site BESS (at your facility) — optional, scoped per contract.

View Project & Request Pricing

Powered by ZIANI OS

The AI operating system that runs your power infrastructure. Monitors. Optimizes. Never sleeps.

24/7 Monitoring

Real-time telemetry from every inverter, panel, and battery. Instant anomaly detection.

Predictive Maintenance

AI predicts equipment issues before they become failures. Minimize downtime.

Grid Compliance

Automated IEEE 1547 & IEC 61850 monitoring. Real-time violation alerts.

Performance Analytics

Track generation, efficiency, and revenue. Automated reporting for stakeholders.

Explore ZIANI OS

We Handle Everything

End-to-end delivery. You focus on your business.

1

Land & Permits

We secure land, handle all regulatory approvals, environmental clearances, and grid connectivity.

2

Design & Build

EPC delivered through qualified partners. Solar, wind, BESS-ready sites, biomass & waste-to-energy — scoped to your load profile and delivery timeline.

3

Operate & Maintain

24/7 AI-managed operations when under contract. Predictive maintenance and long-term O&M scoped to your agreement.

4

Compliance & Carbon

Grid compliance, regulatory reporting, carbon credit monetization — all handled.

You sign. We deliver power.

No land hunting. No contractor management. No regulatory headaches. Just reliable power.

Pick Your Path

Three ways to secure dedicated power

Direct PPA

Zero capex. Instant savings.

  • Open-access offtake — we develop, you buy power
  • 10–25 year price protection; ₹5.0–₹5.5/kWh indicative daytime solar
  • 15-year preferred PPA, extendable to 25; BESS optional
  • Grid backup maintained

Khurda Energy Park offtake is under development. Add plant-side BESS or our Reliability tier if your load profile requires it.

Most Popular

Dedicated Plant

Your plant. Maximum savings.

  • Dedicated solar — BESS-ready site design
  • Bypass grid charges where captive structure applies
  • Depreciation + tax benefits
  • Plant-side BESS optional; Reliability tier for on-site backup

EPC through qualified partners. You own the infrastructure when structured as captive. Scope BESS in your design if needed.

Reliability

On-site BESS. Zero downtime.

  • Everything in Direct PPA or Dedicated
  • On-site BESS at your facility for instant backup
  • 99.95% uptime SLA
  • Optional: hydrogen fuel cell for extended backup

For furnaces, data centers, cold chain. On-site BESS handles grid failures. Add hydrogen for multi-hour backup (99.99%).

For industries that never stop.

Data Centers

Steel & Cement

Food & Cold-Chain

Hospitals

Industrial Parks

Your industry will be carbon negative.

Equipment-verified. Real-time tracked. First plant projections.

6,250

Tonnes CO2e

Projected per plant annually

₹3.12L

Carbon Revenue

Projected per plant annually

A+

ESG Rating

Institutional compliance

Real-Time

Verification

Equipment-backed proof

Not just renewable certificates.
Equipment-verified carbon credits with real-time tracking. First plant ready.

✓ VCS Ready✓ Gold Standard Ready✓ Equipment Verification System✓ Real-Time Tracking Built

Built-in compliance. Not an afterthought.

Pre-certified for grid interconnection. Ready for enterprise procurement.

Grid Compliance

IEEE 1547 & IEC 61850 Compatible

Designed for utility interconnection standards. Automated frequency regulation, voltage control, and power quality monitoring.

Security Standards

SOC 2 & ISO 27001 Aligned

Controls designed for SOC 2 readiness and hyperscaler vendor requirements. Continuous monitoring and audit trails.

Live Compliance

Real-time Tracking

Automated violation detection and alerting. Continuous compliance monitoring with instant notifications.

Audit Ready

Automated Reporting

Complete audit trails for insurance, regulatory reporting, and carbon credit verification. Export-ready documentation.

Built for compliance from day one. Our systems are designed for grid interconnection and enterprise security standards.

✓ IEC 61850 Grid Communication✓ IEEE 1547 Interconnection✓ SOC2 Type I/II Ready✓ ISO 27001 Aligned✓ ISO 50001 Energy Management✓ Automated Audit Trails

Not solar panels. Infrastructure.

Why ZIANI wins

Execution that delivers

We build infrastructure, not pitch decks. First plant launching.

Capital that works

Project finance under structuring. Capital aligned to project milestones.

AI that never sleeps

ZIANI OS monitors every asset, 24/7. Catches issues before they become failures.

Learn about ZIANI OS →

Your industry will run on ZIANI.

Request ProposalSchedule Consultation

From the Field

Real insights from building reliable industrial power infrastructure

Solar Power for Sponge Iron & Steel Plants in Odisha: 25% Lower Power Costs

Nov 20, 2025

Reduce power costs with solar open-access offtake. Indicative daytime solar ₹5.0–₹5.5/kWh. 10–25 year price protection. Keep grid backup.

sponge-iron
steel
odisha
industrial-solar
power-purchase-agreement

ESG Compliance in 6 Months: Renewable Energy for Manufacturing

Nov 20, 2025

Your lender asked for an ESG roadmap. Your export customers need carbon disclosure. Your board wants sustainability metrics. Solar delivers all three in 6 months.

esg
sustainability
carbon-reporting
lender-requirements
export-compliance

Grid Connection Taking 3+ Years? Go Direct.

Nov 20, 2025

Applied for 50 MW grid connection. Utility said 3-5 years. Meanwhile your datacenter sits empty. We deliver dedicated power in 12 months.

grid-connection
datacenter
manufacturing
delays
View All Articles