Your Odisha factory pays ₹9-12/kWh for grid power.
Grid outages cost ₹50 lakh per shutdown. Diesel backup costs ₹18-22/kWh.
Indicative daytime solar via open access — typically well below grid. Zero capex PPA structures available.
Pricing note: 10–25 year price protection, ₹5.0–₹5.5/kWh indicative daytime solar, 15-year preferred PPA (extendable to 25). Plant-side BESS (at the solar park) and on-site BESS (Reliability tier at your facility) are separate, optional scopes — not bundled by default.
The Odisha industrial power problem
Manufacturing facilities across Khurda, Angul, Jharsuguda, and Paradip face:
High Grid Costs:
- ₹9-12/kWh industrial tariffs
- 8% annual increases
- Demand charges add 40-50%
- Power factor penalties
Reliability Issues:
- Frequent grid outages
- Production shutdowns
- ₹50 lakh+ loss per incident
- No advance warning
Diesel Dependency:
- ₹18-22/kWh backup cost
- Fuel price volatility
- Maintenance headaches
- Carbon emission penalties
Connection Delays:
- 3-5 year queue for new connections
- Uncertain timelines
- High connection charges
- Capacity constraints
Odisha solar advantage
Excellent Solar Resource:
- 1,800+ kWh/kWp annual yield
- 5+ kWh/m²/day irradiance
- Best in Eastern India
- Year-round consistency
Strong Policy Support:
- Single-window clearances
- Solar park infrastructure
- Grid evacuation ready
- Industrial promotion schemes
Perfect for Industries:
- Steel mills (Angul, Jharsuguda)
- Aluminum plants (Angul)
- Chemical facilities (Paradip)
- Data centers (Khurda)
- Manufacturing parks (all districts)
What we deliver
Dedicated Solar Power Plant
Not rooftop panels. Ground-mounted solar farm sized to your load.
Option 1: Direct PPA (Open Access)
- Zero capex from you
- Indicative ₹5.0–₹5.5/kWh daytime solar (landed cost varies)
- 15-year preferred PPA, extendable up to 25 years
- We develop; you offtake via open access
- BESS-ready — plant-side storage optional on request
Option 2: Dedicated Plant
- You own dedicated solar — BESS-ready site design
- Maximum cost savings where captive structure applies
- Depreciation benefits when you own assets
- Plant-side BESS optional; scoped if needed
Option 3: Reliability
- Everything in Direct PPA or Dedicated
- On-site BESS at your facility for instant backup
- 99.95% uptime SLA — for furnaces, data centers, cold chain
- Optional: hydrogen fuel cell for extended multi-hour backup
Real Odisha examples
50 MW Steel Plant — Angul
Current Grid:
- Consumption: 175 GWh/year
- Rate: ₹11/kWh average
- Annual cost: ₹19.25 crore
- 18 outages last year = ₹9 crore losses
- Diesel backup: ₹2.5 crore
With ZIANI Dedicated Solar Plant:
- Same consumption: 175 GWh/year
- Indicative rate: ₹5.0–₹5.5/kWh daytime solar (illustrative)
- Annual cost: ₹9.6 crore
- If scoped, plant-side BESS extends solar into evening hours
- Add Reliability tier for on-site backup to eliminate outages
- Savings: ₹9.65 crore + ₹11.5 crore = ₹21.15 crore annually
25 MW Chemical Plant — Paradip
Current Grid:
- Consumption: 90 GWh/year
- Rate: ₹10/kWh
- Annual cost: ₹9 crore
- Peak demand charges: ₹2.5 crore
With ZIANI solar (plant-side BESS if scoped):
- Rate: ₹8/kWh blended
- Annual cost: ₹7.2 crore
- If scoped, plant-side BESS extends delivery hours, avoids curtailment
- Add Reliability tier for demand charge elimination via on-site battery
- Savings: ₹4.3 crore annually
Location coverage
We operate across Odisha:
Khurda District:
- 48 MW solar project under development
- OPTCL feasibility complete; approvals received
- 15 km from Bhubaneswar
- Open-access offtake now being accepted
Angul District:
- Heavy industry corridor
- Steel and aluminum clusters
- High solar resource
- Land availability excellent
Jharsuguda District:
- Industrial powerhouse
- Existing manufacturing base
- Strong grid infrastructure
- Immediate project potential
Paradip Region:
- Port access for logistics
- Chemical and refining clusters
- Coastal solar advantage
- Export-oriented industries
6-month delivery timeline
Month 1: Assessment & Approvals
- Load analysis
- Space verification
- PPA signed
- Financing closed
Month 2-5: Construction
- Equipment procurement
- Solar installation
- Battery integration (if selected)
- Grid connection
Month 6: Commissioning
- Testing completed
- Grid synchronization
- Operations start
- Power delivery begins
Why Odisha industries choose us
Local Presence:
- Khurda Energy Park under development
- On-ground team in Bhubaneswar
- Know local regulations
- Fast response times
Proven Execution:
- First 50MW plant launching
- Equipment pre-qualified
- Contractors experienced
- Supply chain secured
Financial Certainty:
- 10–25 year price protection framework
- Indicative tariff; final landed cost in your proposal
- Bankable structures under development
- Project finance under structuring
Complete Operations:
- We handle maintenance
- We monitor performance
- We guarantee uptime
- You just use power
The Odisha solar reality
Grid power costs will keep rising. Utility tariffs increase 8% annually. Your costs compound. You have zero control.
Solar offers long-term price protection — indicative ₹5.0–₹5.5/kWh daytime supply; plant-side or on-site BESS optional. 15-year preferred PPA, extendable up to 25 years.
Illustrative savings depend on your load profile and open-access charges.
For 10+ MW industries in Khurda, Angul, Jharsuguda, Paradip.
For facilities with high annual power costs.
For manufacturers tired of grid outages and diesel dependency.
We are developing solar power capacity across Odisha — including Khurda Energy Park. Request an indicative proposal for your facility.
Request a site-specific assessment—we'll calculate your exact savings with facility load data and show 6-month delivery timeline for your Odisha location.
Disclaimer: All cost savings and project examples are illustrative estimates based on typical industrial facilities in Odisha and current market conditions. Actual savings will vary based on facility-specific load profiles, existing power costs, site conditions, and equipment performance. Power outage impacts and diesel backup savings are estimates that will vary by facility. All projects require detailed site assessment, feasibility study, land verification, and regulatory approvals. Delivery timelines are estimates subject to permitting, financing, and site-specific conditions. This content is for informational purposes only and does not constitute a guarantee or binding offer. Contact us for detailed site-specific proposal with actual project terms and conditions.